Monday, June 17, 2013

3... 2... 1... and lights are out

my house looks like in war zone this week (*o*). can't imagine how the guys work during the day ... let's check out the series of works completed:

1. water pipes are up ... and boxed-up nicely

original (left)   10 Jun: new stainless pipes (center)   12 Jun: boxed up (right) 
glad that id instructed to hide the beam within the box too :) *happy*

2. aircon pipes are up ... trunking everywhere
some can be hidden

now you see it (left)  and now you don't (right) 
and some not ...
storeroom
3. wiring are done ... *poof* lights are out 
wires, wires and wires ... for the db (left)  lighting pt for dining (center)  power pt for kitchen (right)
and yey my SCV cables run well afterall *yippee* saved 50 bucks haha ...
study room - SCV cabling 
4. false ceilings are up
sooooooooo excited to see how the cove lights will turn out after installation

5. even parquet are laid in 1 day *wo* superman speed
16-Jun: master bedroom (left)  study room (right)
the coloring of the timber flooring on study room looks kinda worrying to me ... the distinct change of wood color.  have highlighted to my id :-( *sob sob*  let's hope that my worries are unfounded and it will be fine after sanding.  stay tuned !

for the next few weeks, things will probably slow down now as they fabricate the carpentry off-site and until they obtain the approval to fix the "drain".  but still will keep a lookout for surprise ;-)

2 comments:

heihei said...

Looks 70% done! Excited too to see the finished deco

Jo said...

barely 70% ley. probably another 3-4 weeks :( ... hope to post the final pic soon !!!