Sunday, May 26, 2013

wall tiles are up !

tiling work is scheduled for my house till end of may ... let's check out the progress after 1 week *grin*

18-May kitchen walls and toilet walls are first plastered with cement (or so i reckon ... )
18-May (kitchen)
18-May (master bedroom bathroom)











20-May walls tiles are "tiling"-up
20-May (master bedroom bathroom)
20-May (kitchen)




















25-May TA DA ... wall tiles are done up for kitchen and bathroom
25-May (kitchen)
25-May (kitchen side with cabinet)
25-May (kitchen rubbish chute)
25-May (master bedroom bathroom)
ok dok. stay tune for the floor tiles :)